DOWNER EDI Engineering POWER PTY LTD

Onslow DER Project – Transmission Line, Onslow WA

November 2017 – May 2018

Scope of Work: Plant/ Labour & Supervision Hire for Transmission Line Works.


DOWNER EDI Engineering POWER PTY LTD

Onslow DER Project, Onslow WA

November 2017 – May 2018

Scope of Work: Mine, screen, supply and transport of 10,500T of sand from Barradale sand lease  130km South of Onslow to the Transmission Line Works site. 


Screen Shot 2018-07-19 at 5.14.37 pm.png

SHIRE OF ASHBURTON PTY LTD

Onslow Airport – Runway Remediation Works, Onslow WA

October 2017 – April 2018

Scope of Work: Removal of existing loose cohesion-less material and armour rock on top of the existing geotextile material, removal and disposal of existing Bidim geotextile material, fill batters with new general fill from onsite, compact and trim the batter to shape, dig anchor trenches at the top and bottom of the batters, spread the Texcel geotextile material on the new shaped batters including the anchor trenches and installation of rock rip rap material (27,500m² of rock armour placed).


Screen Shot 2018-07-19 at 5.17.29 pm.png

MARITIME CONSTRUCTION PTY LTD

Onslow Marine Support Base (OMSB) Insitu Concrete Works, Onslow WA

July 2017 – November2017

Scope of Work: Construction of a 20m wide boat ramp, 300t crane lift pad and installation of pre-cast capping beams.


Screen Shot 2018-07-19 at 5.19.22 pm.png

DDGT PTY LTD

Tubridgi Gas Storage Well Campaign, Onslow WA

October 2016 – December 2017

Scope of Work:

Civil Earthworks – Access road construction/maintenance, Establish, Quarrying and Rehabilitation of Borrow Pits),  Well drill site laydown/drill pad construction. 

Concrete Works - Construction of Two (2) Sets of Foundations for a Compressor Slab and Cooler Foundation Slab, Pad/foundation construction for plant facility equipment.

Plant & Labour Hire - Construction of the TGS Flowlines based upon 10km of Piping.


PINDAN CONTRACTING PTY LTD

Construction of Onslow Aquatic and Reception Centre, Onslow WA

October 2016 – February 2017

Scope of Work: Concrete Works - Building/Structure Slabs (385m²), Footpaths/Paving/Entrances (965m²), Footings (31m³), Shade Sail Footings (200m³), Backfill and Compact below and around footings.


PINDAN CONTRACTING PTY LTD

Construction of Multi-Purpose Courts, Onslow WA

January 2016 – July 2016

Scope of Work: Bulk Civil Earthworks of court foundation layers including; stripping of vegetation and topsoil (654m³), Cut and Fill (2,760m³) importing of additional sand (3,500m³) and Compaction Testing.

Construction of carpark area including entry and exit points onto shire roadway included; . stripping of vegetation and topsoil (515m³), Cut and Fill (126m³) importing of additional sand (1,600m³), Compaction Testing, Basecourse import/installation and asphalting/kerbing/line marking of parking area.


Screen Shot 2018-07-19 at 5.29.57 pm.png

MARITIME CONSTRUCTION PTY LTD

Onslow Marine Support Base (OMSB) Civil Early Works Project, Onslow WA

November 2016 – December 2016

Scope of Work: Clearing/grubbing and construction of  a laydown area and Construction of Two-Tier Dredge Spoil Pond.


Screen Shot 2018-07-19 at 5.33.08 pm.png
Screen Shot 2018-07-19 at 5.36.53 pm.png

DDG ASHBURTON pty ltd

Civil Works at Ashburton Onslow Gas Pipeline (AOGP) Project, Onslow WA

April 2016 – June 2016

Pipeline Construction: Works included; Transport, string, clearing (300,000m²), trenching, HDD of 3 x road and 1 x creek crossings (220m). Installation, backfill of a 100mm steel  pipeline, 10km in length along with rehabilitation of work corridor.

Meter Station Construction: Works included; Subgrade to base course construction of a raised station pad, rip-rap erosion protection with geofabric underlay, box culvert supply and installation, earthing rod installation (installation by third party), pipe support concrete precast block installation and setting and assistance with auxiliary works related to meter station completion and commissioning.


Screen Shot 2018-07-19 at 5.45.05 pm.png

BRIERTY LIMITED

Broome Road Industrial Park Subdivision, Broome WA

August 2015 – December 2015

Scope of Work: Stringing out, fusion welding and installation of 2 x 1680m long HDPE DN630 PN16  potable water mains, including pressure testing and disinfection of the main.


ERTECH HOLDINGS

Supply & Deliver Water, Onslow WA

August 2014 – April 2015

Scope of Work: Supply and deliver of construction water to the Onslow townsite subdivision area utilising single and double water tanker configuration. 


Drilline_Project1-256x262-2.jpg

Department of Housing

Decommission and Decontamination of Bindi Bindi Waste Water Treatment Pond, Onslow WA

October 2014 – March 2015

Scope of Work: The cartage of 750T of contaminated soil in double and triple side tipper configuration, from Onslow to 7 Mile Waste Facility in Karratha. Removal of concrete pond structures, ripping of ground, backfilling and compacting to bring area up to natural land formations levels.


Drilline_Projects2-256x262-2.jpg

Civmec Construction & Engineering

Transportation of 12,550 Precast Concrete Coastal Protection Units (Accropodes), Onslow WA

August 2013 – April 2015

Scope of Work: To transport 12,250 units with 9 units loaded per delivery utilising triple road trains. Units were located at WA Limestone’s Quarry 90km east of the Wheatstone LNG Plant.


Screen Shot 2018-07-19 at 5.51.50 pm.png

Kiewit/Ertech JV

Supply and Deliver Precast Concrete Blocks from Perth to the Wheatstone Project, Onslow WA

September 2013 – November 2013

Scope of Work: To supply and deliver 600 concrete bridge blocks, 70 concrete tie down blocks and 110 concrete finger blocks using triple road trains. The blocks were fabricated in Perth and transported to Wheatstone LNG Plant in Onslow.


Boral Australia

Supply and Transportation of River Sand for the Wheatstone Project, Onslow WA

April 2014 – February 2015

Scope of Work: To supply and deliver screened river sand to the Wheatstone LNG Project using Drilline road trains and side tipper trailers. The Sand was extracted and screened on site.


Drilline_Projects4-256x262-2.jpg

DBP Group – Fortescue River Gas Pipeline Joint Venture

Supply and Transport of Dune Sand to Pannawonica, WA

September 2014 – February 2015

Scope of Work: To supply and deliver of Dune Sand using single, double, triple and quad side tipper configurations. Drilline mined from their Dune Quarry outside of Onslow and transported the material to within 50km east of Pannawonica.


Onsite Rental Group

Loading, Transportation and Unloading of Plant and Equipment, WA

September 2014 – Ongoing

Scope of Work: To supply prime movers and trailers to deliver hire plant and equipment within 300km radius of Onslow.


Dredging International Australia

Civil Earthworks – Construction and demobilisation of Turkey Nest, Onslow WA

April 2014 – December 2014

Scope of Work: Drilline was engaged to construct, install, commission and then demobilise a 20,000 m3 Turkey’s Nest near the Wheatstone Project LNG Plant. Completion of this contract was an incredible achievement as the nature of the works were vast and required utmost precision from Drilline’s Projects Team. The works included:

  • Traffic Management Plan Preparations
  • Excavation of materials
  • Soil Testing (performed by Subcontractors)
  • Geofabric lining
  • Wet Plant and Labour Hire
  • Compaction and levelling works
  • Bulk Haulage (Waste Disposal)
  • Removal of Beams and Piles
  • Freight of Heavy Machinery

Drilline_Projects6-262x262-2.jpg

Dredging International Australia

Supply, Haul and Load-out of Rock for the Slope 20-Soil Replacement Works at Wheatstone Project, Onslow WA

October 2014 – December 2014

Scope of Work: The works consisted of transported rock from a local Onslow quarry to load-out facility located on Beadon Creek. The barges were then steamed from Beadon Creek load-out facility to the MOF harbour on the The Wheatstone Project.


NTC CONTRACTING PTY LTD

Telstra Fibre Routing at Wheatstone LNG Project, Onslow WA

October 2013 – January 2014

Scope of Work: Directional drilling of one (2) 100mm communications conduit under an existing BHP DOMGAS main, a water main and an optic fibre line. The installation of one (2) 100mm communications conduit under Camp Rd 1. These works were required to be undertaken to allow the installation of a Telstra optic fibre cable. 


Screen Shot 2018-07-19 at 5.56.53 pm.png

Total AMS

Construction of Laydown/Hardstand, Onslow WA

July 2013 – October 2013

Scope of Work: Construction of a 10,000 square meter hardstand and laydown area.


NTC CONTRACTING PTY LTD

Seawater Intake Compaction Phase at Wheatstone LNG Project, Onslow WA

November 2011 – May 2012

Scope of Work: Installation of four (4) 160 diamter HDPE pipelines from 250m offshore to the water storage facilities at beachhead – Wheatstone LNG Plant.


Screen Shot 2018-07-19 at 6.00.19 pm.png

ROY HILL STATION

FMG Cloudbreak and Christmas Creek Project, WA

November 2011 – May 2012

Scope of Work: Management of Roy Hill Station, Construction of 150 Man Camp and Maintenance of Access Roads in to FMG sites.